Power & Energy | Dasu Hydropower Project, total install capacity 4,320 MW. Azad Pattan Hydropower Project, total install capacity 700MW. |
Grid Station, Substations, Switchyards | ** 20 plus substation + grid station + power plants done along with supply of material |
Infrastructure |
Lighting Supply | ** Over 5000 Outdoor & Indoor Lighting Projects executed. |
Low Voltage | ** Over 800 Projects done in areas of Fire Fighting, CCTV, Motors, Pumps, Public Address, Central Battery System & Switchgear |
Reliance Industries |
Power & Energy | Dasu Hydropower Project, total install capacity 4,320 MW. Azad Pattan Hydropower Project, total install capacity 700 MW. |
Grid Station, Substations, Switchyards | ** 20 plus substation + grid station + power plants done along with supply of material |
Infrastructure |
Lighting Supply | ** Over 5000 Outdoor & Indoor Lighting Projects executed. |
Low Voltage | ** Over 800 Projects done in areas of Fire Fighting, CCTV, Motors, Pumps, Public Address, Central Battery System & Switchgear |
Reliance Industries |